Casa Smart
Other
On trackVoice Remote (Pilot)
May 15, 2026 → Dec 31, 2026 2 team members
Phase 1
Design & Engineering
Phase 2
Manufacture & Assembly
Phase 3
Quality & Support
Progress
22%
SPI
1.00
≥ 0.95 healthy
CPI
1.00
≥ 0.95 healthy
Quality
92
≥ 85 healthy
Benchmark grading
Product PM (PMI/ISO 21500)
On trackCommercial product portfolios tolerate moderate schedule and cost variance as long as scope and quality are protected. Bands reflect typical earned-value reporting in hardware and firmware programs.
Schedule (SPI)1.00 / ≥ 0.95
Cost (CPI)1.00 / ≥ 0.95
Quality92 / ≥ 85
Open critical defects0 / ≤ 0
Source: PMI PMBOK 7 · ISO 21500
Top AI insights
AI generated
Schedule · AI
Exploratory phase on track
No risks flagged.
Team
MR
Marco Rossi
Customer Lead
LC
Lea Conti
PM