Smart Home Hub Gen 3

Feb 1, 2026Dec 15, 2026 2 team members

Phase 1
Design & Engineering
Phase 2
Manufacture & Assembly
Phase 3
Quality & Support
Progress
41%
SPI
1.00
≥ 0.95 healthy
CPI
0.99
≥ 0.95 healthy
Quality
90
≥ 85 healthy

Benchmark grading

Product PM (PMI/ISO 21500)
On track

Commercial product portfolios tolerate moderate schedule and cost variance as long as scope and quality are protected. Bands reflect typical earned-value reporting in hardware and firmware programs.

Schedule (SPI)1.00 / 0.95
Cost (CPI)0.99 / 0.95
Quality90 / 85
Open critical defects0 / 0

Source: PMI PMBOK 7 · ISO 21500

Top AI insights

AI generated
Schedule · AI

Firmware integration on critical path

Any slip in firmware integration pushes tooling start. Currently on plan.